KEMCO is one of the leading and qualified Grade ‘1st’ Electrical KAHRAMAA Distribution Contractor with vast experience in the respective fields.

The major services consist of Trench Excavation, HV & LV Cable Laying in Trenches, Road crossing by open cut method , Road crossing by HDD ,   11KV HV & LV Cabling, Jointing & Termination Services, Main Distribution Work, Extension of LV Underground Network and Service Connections, HV & LV Reinforcement Works, Direct Service Connection, Installation of Energy Meters, Installation, Testing & Commissioning of 11KV Switchgear, VCB & SF6 Type RMU, Feeder Pillars,  11 KV Cables & Energizing of Indoor & Outdoor Sub-Stations up to 11KV .

The following are the major activities involved in the Distribution projects.

Trench Excavation. Installation of Generators & Associated Cables.
HV/LV Cable jointing & Termination Works. Installation of Package Substations.
Construction of Road Crossing by Horizontal Directional Drilling/Open Cut Method. Substation Earthing Works.
HV + PILOT/LV Cable Installation. Control Cable Installations.
Replacing/Re-Routing of Cables. Distribution Substation Electrification Works. (MICC Wiring)
Carrying Out Damage Repairs of Cables. Fixing of Cable Trays, Ladders & Support Structures.
Replacement/Installation of Substation Equipments. (Transformers, HV Panels, RMU, Feeder Pillars/MV Panels) Installation of Fire Retardant Paint on Cables.
Installation of Battery Chargers, Marshalling Box & Tripping Cables. Installation of Fire Retardant Sheets.
Relocation of Distribution Substations. Duct Sealing Works Inside Substations.
Construction of Distribution Substations.